Free Assessment

Is This Process a Good Fit for a Robot?

Screen the application, check throughput and test conservative payback before you commit budget. Nothing is sent anywhere unless you choose to contact us.

MAQINA — Robot Application Fit. Printed results are estimates based only on the visitor's own inputs.

How this assessment works

Three quick checks before spending money on a robot cell: does the application suit a robot, can a cell keep up with demand, and do conservative, all-in numbers make sense? Example values are filled in — replace them with your own.

This is a screening tool. It does not replace a feasibility study or a risk assessment, does not establish that a cell is safe, and its payback figures are estimates from your inputs, not promises.

This assessment runs in your browser and needs JavaScript. You can still describe your situation by email to business@maqina.ai.

1. Application fit

Answer what you can. "Don't know" is a useful answer — it shows what a feasibility review must find out.

Parts arrive in a consistent position and orientation, or can be fixtured or located with vision (critical)
Part variation (size, shape, material, finish) is limited or predictable
Part weight, size and surfaces allow a reliable grip or tool (critical)
The task is a repeatable sequence without frequent judgement calls
The required cycle time is known and stable
Quality or inspection criteria are defined and measurable
Changeovers are infrequent or can be planned
Floor space is available for the cell and its safeguarding (critical)
Upstream and downstream steps can feed and accept parts at the required rate, or buffers exist
Utilities (power, compressed air, network) are available or can be added
Operators and maintenance staff can be trained to run and recover the cell
A risk assessment and safeguarding design will be done for this application by a qualified party (critical)

2. Cycle time and throughput

What the process must produce.
Your best estimate; a feasibility study verifies it with the actual part and layout.
Share of scheduled time the cell actually runs (faults, refills, changeovers). 85% is a cautious starting point.
Maximum parts/hour the previous step can deliver. Leave 0 if it is not a limit.
For comparison only. Leave empty if unknown.

3. Conservative economics

Labor time affected

Can be a fraction, e.g. 0.5 if one person spends half their time on it.
Wage plus benefits, payroll taxes and overhead per hour.
People still load, supervise, recover faults and handle exceptions. 100% is rarely realistic.

Other annual effects

Only effects you can quantify, e.g. scrap or rework reduction.
Maintenance, spare parts, support, programming changes, energy.

All-in investment

Guarding, scanners or light curtains, safety controller — as defined by the risk assessment.
Allowance for unknowns. 15–25% is common at this stage.

Your summary

Plain text built from your entries on this page. It stays in your browser unless you copy it, print it or add it to a message and send it.


          
          

Review this automation application

Talk it through with an automation engineer in a free 15-minute consultation. A photo or a link to a short video of the current process helps. Adding your results is optional. Prefer a separate page? Open the consultation form.

This form needs JavaScript. If the send button stays inactive, please email business@maqina.ai instead.

Sending this form shares your details and message with MAQINA so we can reply to your inquiry. It does not sign you up for marketing emails. See our privacy policy.

Already have a defined project, drawings or an RFQ? Request a project review instead — you can paste your copied summary into the description.