Free Checklist

Is Your Controls Work Package Ready to Hand Off?

Check PLC/HMI, electrical, I/O, FAT and handoff readiness, see the blockers, and draft a defined work package. Nothing is sent anywhere unless you choose to contact us.

MAQINA — OEM Controls Readiness. Printed checklist reflects the visitor's own answers; it is not a certification.

How this checklist works

Controls work packages go wrong when the inputs are not ready: an I/O list that does not match the drawings, no agreed acceptance criteria, unclear safety ownership. Mark each item. N/A items are left out; Ready counts 1, Partial ½. Critical items that are not ready are listed as blockers.

This is a planning aid for scoping engineering work. It is not a compliance assessment or a certification of any kind.

This assessment runs in your browser and needs JavaScript. You can still describe your situation by email to business@maqina.ai.

1. PLC/HMI, electrical, FAT and handoff readiness

Scope and specification

Functional specification or sequence of operations is written and approved (critical)
End-user standards and preferred hardware are identified
A change-control process is agreed (how scope changes are approved and priced)

PLC and HMI

PLC and HMI platform, models and software/firmware versions are selected
Engineering software licenses are available for the work
Program structure, tag naming and coding standards are agreed
HMI screen list and alarm philosophy are defined
Existing code or templates are provided under revision control (or none are needed)

Electrical controls and I/O

I/O list is complete and matches the electrical drawings (critical)
Electrical schematics are at a current, controlled revision
Panel layout and bill of materials are released
Network architecture and IP address plan are defined
Datasheets and manuals for field devices are available

Safety ownership

The owner of the machine risk assessment and safety validation is identified (critical)
Required safety functions are documented by the responsible party
Responsibility for interlock and emergency-stop design is assigned

Factory acceptance test (FAT)

A FAT procedure or test plan is written
FAT acceptance criteria and sign-off authority are defined (critical)
Simulation or test equipment for the FAT is available
Punch-list and re-test process is agreed

Engineering handoff

Deliverables are agreed (source code, backups, as-built drawings, manuals)
Commissioning and site-support responsibilities are planned
Operator and maintenance training scope is defined
Warranty and support boundaries after handoff are agreed

2. Scope-development aid

Add a few facts to turn your answers into a draft work-package outline you can print, or copy and edit in a project request.

Optional, plain text — e.g. the PLC family and HMI software you use.
Digital plus analog points. Leave 0 if unknown.
Leave 0 if unknown.
Optional.

Your summary

Plain text built from your entries on this page. It stays in your browser unless you copy it, print it or add it to a message and send it.


          
          

Ready to scope a defined controls work package?

Send the package through a project request — copy your summary into the description and attach the I/O list, drawings or specification (up to 5 files, 5 MB each, 10 MB in total).

Discuss a defined controls work package

Not sure yet? Talk it through first

A free 15-minute consultation with an automation engineer to see whether the package is ready to quote. Adding your results is optional. Prefer a separate page? Open the consultation form.

This form needs JavaScript. If the send button stays inactive, please email business@maqina.ai instead.

Sending this form shares your details and message with MAQINA so we can reply to your inquiry. It does not sign you up for marketing emails. See our privacy policy.

Already have a defined project, drawings or an RFQ? Request a project review instead — you can paste your copied summary into the description.