Free Assessment
What Is This Recurring Fault Costing You?
A transparent downtime-impact estimate and an evidence checklist for recurring controls problems. Nothing is sent anywhere unless you choose to contact us.
MAQINA — Downtime Impact Assessment. Printed results are estimates based only on the visitor's own inputs.
How this estimate works
A recurring fault costs a plant in three ways: output that is never recovered (valued at contribution margin, not selling price), the extra cost of output that is made up later, and the direct cost of each stop. This calculator adds those three and shows a range for what fixing the root cause might be worth to you. Example values are filled in — replace them with your own.
It is an estimate from your inputs, not a quote, a guarantee or an observed saving.
This assessment runs in your browser and needs JavaScript. You can still describe your situation by email to business@maqina.ai.
1. Downtime impact calculator
The recurring problem
Production and margin
What a fix might achieve (your judgement)
Your estimate
| Monthly component | Estimate | How it is calculated |
|---|---|---|
| Theoretical lost output (capacity view) | units | downtime hours × output per hour — shown for context only, not as money |
| Output never recovered | units | theoretical lost output × (100% − made up) |
| Lost contribution margin | units never recovered × contribution margin per unit | |
| Make-up production cost | downtime hours × share made up × cost per make-up hour | |
| Direct cost of stops | stops × direct cost per stop | |
| Total per month | sum of the three money rows (made-up output is not also counted as lost margin) |
What this does not include
- Late-delivery penalties, lost customers, expedited freight, quality escapes and safety incidents — add them only if you can quantify them.
- Whether this machine limits the whole plant. If it is not the bottleneck, more of the lost output may be made up than you expect.
- The cost of the fix itself. Compare the range above with a scoped quote before deciding.
2. Recurring-fault evidence checklist
Having this information ready shortens troubleshooting and can make remote diagnosis possible. Mark each item; N/A items are left out of the score.
Evidence readiness
Gather these before a troubleshooting visit:
Your summary
Plain text built from your entries on this page. It stays in your browser unless you copy it, print it or add it to a message and send it.