Free Assessment

What Is This Recurring Fault Costing You?

A transparent downtime-impact estimate and an evidence checklist for recurring controls problems. Nothing is sent anywhere unless you choose to contact us.

MAQINA — Downtime Impact Assessment. Printed results are estimates based only on the visitor's own inputs.

How this estimate works

A recurring fault costs a plant in three ways: output that is never recovered (valued at contribution margin, not selling price), the extra cost of output that is made up later, and the direct cost of each stop. This calculator adds those three and shows a range for what fixing the root cause might be worth to you. Example values are filled in — replace them with your own.

It is an estimate from your inputs, not a quote, a guarantee or an observed saving.

This assessment runs in your browser and needs JavaScript. You can still describe your situation by email to business@maqina.ai.

1. Downtime impact calculator

The recurring problem

Count of events, e.g. from the alarm log or shift notes.
From stop to good production again, including restart and first-off checks.

Production and margin

Sellable units per hour at normal speed.
Selling price minus variable costs (material, energy, freight, commissions). Not the selling price.
Recovered through overtime, extra shifts or spare capacity. 0% if lost sales are gone; 100% if all of it is made up.
Overtime premium, extra staffing and energy for one hour of make-up production.
Repair labor, parts, scrap and rework for one stop. Enter 0 if unknown.

What a fix might achieve (your judgement)

Share of this downtime a fix might remove — be cautious.
Upper end of your range. 100% assumes the problem never returns.

2. Recurring-fault evidence checklist

Having this information ready shortens troubleshooting and can make remote diagnosis possible. Mark each item; N/A items are left out of the score.

A clear description of the symptom and the machine or line affected
Alarm or fault history from the HMI or PLC (export, screenshot or photo)
A log of occurrences: date, shift, duration and product running
PLC and HMI make, model and firmware or software versions
A current backup of the PLC and HMI programs
Changes made shortly before the problem started (hardware, program, product or process)
Electrical drawings for the affected equipment
A network layout for the affected devices
Photos or a short video of the fault or of the workaround
Spare parts on hand for the suspected components
How operators currently recover from the fault, and who resets it
Who can approve remote or on-site troubleshooting access

Your summary

Plain text built from your entries on this page. It stays in your browser unless you copy it, print it or add it to a message and send it.


          
          

Discuss a recurring controls problem

Talk it through with an automation engineer in a free 15-minute consultation. Add your results to the message if you want us to see them — it's optional. Prefer a separate page? Open the consultation form.

This form needs JavaScript. If the send button stays inactive, please email business@maqina.ai instead.

Sending this form shares your details and message with MAQINA so we can reply to your inquiry. It does not sign you up for marketing emails. See our privacy policy.

Already have a defined project, drawings or an RFQ? Request a project review instead — you can paste your copied summary into the description.